Our Project Gallery
-
Clause 8.2.1.3a : Verification of Temperature rise Limits – Feeder Elements without Tap-off Unit
-
Clause 8.2.1.3b : Verification of Temperature rise Limits – Feeder Elements with Tap-off Unit
-
Clause 8.2.1.8 : Thermal Cycling Test
-
Clause 8.2.2 : Verification of Dielectric Properties
-
Clause 8.2.3 : Verification of short Circuit Strength (Icw)– Feeder Elements without Tap-off Unit
-
Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icw) – Feeder Elements without Tap-off Unit
-
Clause 8.2.3.2.3a : Verification of Short Circuit Strength (Icc) - Feeder Elements without Tap-off Unit
-
Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icc) – Feeder Elements without Tap-off Unit
-
Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icc) – Feeder Elements without Tap-off Unit
-
Clause 8.2.6 : Verification of Mechanical Operation
-
Clause 8.2.7 : Verification of Degree of Protection – (Busbar)
-
Clause 8.2.7 : Verification of Degree of Protection – (Busbar)
-
Tracking Index Test :- Clause 8.2.9 : Verification of the Resistance of Insulating Materials to Abnormal Heat and Fire
-
Glow-Wire Test :- Clause 8.2.9 : Verification of the Resistance of Insulating Materials to Abnormal Heat and Fire
-
Clause 8.2.10 : Verification of Structural Strength
Clause 8.2.12 : Verification o Cushing Resistance -
Clause 8.2.13 : Verification of Electrical Characteristics of Busbar Trunking System
-
Clause 8.2.14 : Verification Resistance to Flame Propagation
-
Clause 8.2.15 : Verification of Fire Resistance in Building Penetration