Our Project Gallery

  • Clause 8.2.1.3a : Verification of Temperature rise Limits – Feeder Elements without Tap-off Unit

     

  • Clause 8.2.1.3b : Verification of Temperature rise Limits – Feeder Elements with Tap-off Unit

     

  • Clause 8.2.1.8 : Thermal Cycling Test

     

  • Clause 8.2.2 : Verification of  Dielectric Properties

     

  • Clause 8.2.3 : Verification of short Circuit Strength (Icw)– Feeder Elements without Tap-off Unit

     

  • Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icw) – Feeder Elements without Tap-off Unit

     

  • Clause 8.2.3.2.3a : Verification of Short Circuit Strength (Icc) - Feeder Elements without Tap-off Unit

  • Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icc) – Feeder Elements without Tap-off Unit

     

  • Clause 8.2.4.2 : Verification of effectiveness of the Protective Circuit (Icc) – Feeder Elements without Tap-off Unit

     

  • Clause 8.2.6 : Verification of Mechanical Operation

     

  • Clause 8.2.7 : Verification of Degree of Protection – (Busbar)

     

  • Clause 8.2.7 : Verification of Degree of Protection – (Busbar)

     

  • Tracking Index Test :- Clause 8.2.9 : Verification of the Resistance of Insulating Materials to Abnormal Heat and Fire

     

  • Glow-Wire Test :- Clause 8.2.9 : Verification of the Resistance of Insulating Materials to Abnormal Heat and Fire

     

  • Clause 8.2.10 : Verification of Structural Strength
    Clause 8.2.12 : Verification o Cushing Resistance

  • Clause 8.2.13 : Verification of Electrical Characteristics of Busbar Trunking System

     

  • Clause 8.2.14 : Verification Resistance to Flame Propagation

     

  • Clause 8.2.15 : Verification of Fire Resistance in Building Penetration